FF
FORGE & FRAME
STRUCTURAL STEEL // UNIT 2B, PENICUIK
Menu
Stock photograph of a large agricultural storage building

Commercial units · one contract

Commercial units. Slab to keys.

One contract. One programme. Groundworks, frame, cladding, doors and services. Priced in 24 hours.

Workshops, storage, light industrial bays and yard units. Same programme as a farm building: design, consents support, groundworks, EXC2 frame, envelope, openings and the services on the brief.

Stock illustration — farm storage building, not our portfolio (Unsplash).

What the package covers

A commercial unit is not a beam dropped into someone else’s shell. The stages below are the contract.

Full package stages
StageOn the contract
DesignSizes, loads and drawings for the building on the brief.
ConsentsDrawings an agent can lodge. Prior notification or a full application stays with the council.
GroundworksSlab and holding-down, programmed with the frame on the same contract.
Frame EXC2Hot-rolled portal, UKCA Execution Class 2, cut at the Penicuik workshop.
EnvelopeRoof and wall cladding to the spec agreed on the price.
OpeningsVehicle doors and personnel doors, included rather than left as a later trade.
ServicesServices named on the brief, coordinated through to handover.

How a unit runs

  1. 01

    Enquiry

    Use, size, postcode and a photo of the ground.

  2. 02

    24h price

    One price for the package. Guide bands are not published.

  3. 03

    Programme

    Stage dates agreed before anyone breaks ground.

  4. 04

    Slab

    Groundworks on this contract, in the sequence on the programme.

  5. 05

    Frame

    EXC2 steel from Penicuik, stood to the drawings.

  6. 06

    Envelope

    Cladding, roof and openings closed in.

  7. 07

    Handover

    Certificates and a building you can use.

Payment follows the programme. The price is one contract, invoiced as each stage completes: after the price is accepted, then slab, frame, envelope and handover. You are not left to hire a second contractor for the concrete.

// 24_HOUR_PRICE

Priced in 24 hours

Use, size and where the building sits. The same lead form as the rest of the site. No published guide price.

STEEL_GRID_01

What are you building

Heavier frames and site erection notes still sit on commercial steelwork. This page is the turnkey unit: slab to keys, priced in 24 hours.