FF
FORGE & FRAME
STRUCTURAL STEEL // UNIT 2B, PENICUIK
Menu
Stock photograph of a large agricultural storage building

Commercial units

Commercial units, designed, fabricated and erected.

Frame, cladding and doors, supplied and erected. Priced in 24 hours. Foundations and groundworks stay with you or your foundation designer. We interface on base loads and holding-down bolts.

Workshops, storage, light industrial bays and yard units. Design, consents support, the frame, envelope and openings. Foundations and groundworks stay with you or your foundation designer.

Stock illustration — farm storage building, not our portfolio (Unsplash).

What supply and erect covers

A commercial unit is the steel building: design, fabricate and erect the frame, cladding and doors. Foundations and groundworks stay with you or your foundation designer.

Steel building supply and erect stages
StageDetail
DesignSizes, loads and drawings for the steel building on the brief.
ConsentsDrawings an agent can lodge. Prior notification or a full application stays with the council.
FoundationsThe slab and groundworks stay with you or your foundation designer. We interface on base loads and holding-down bolts so the frame can land on them.
FrameHot-rolled portal frame for the building on the brief.
EnvelopeRoof and wall cladding to the spec agreed on the price.
OpeningsVehicle doors and personnel doors, included with the steel building.
ServicesThe steel price is the frame, cladding and doors. Electrics and internal finishes stay on your own brief.

How a unit runs

  1. 01

    Enquiry

    Use, size, postcode and a photo of the ground.

  2. 02

    24h price

    One price for the steel building. Guide bands are not published.

  3. 03

    Programme

    Stage dates for supply and erection, agreed before the frame leaves the workshop.

  4. 04

    Foundations

    Your foundation designer sets out the slab. We check holding-down bolts against the frame drawings, then erect.

  5. 05

    Frame

    Frame stood to the drawings.

  6. 06

    Envelope

    Cladding, roof and openings closed in.

  7. 07

    Handover

    Certificates for the steel building.

Payment follows the steel programme, invoiced as each stage of supply and erection completes.

// 24_HOUR_PRICE

Priced in 24 hours

Use, size and where the building sits. The same lead form as the rest of the site. No published guide price.

Step 1 of 3

What are you building

Heavier frames and site erection notes still sit on commercial steelwork. This page covers commercial units, designed, fabricated and erected, priced in 24 hours.