FF
FORGE & FRAME
STRUCTURAL STEEL // UNIT 2B, PENICUIK
Case Files

Technical Structural
Case Studies

Proven engineering • EXC2 Compliance • Direct Scotland Client Portfolio

Aesthetic Clear-Span Equestrian Riding Arena
Fife, Scotland 2025 Contract: £85,000

Aesthetic Clear-Span Equestrian Riding Arena

Kinross Equestrian Centre required a premium, fully enclosed indoor riding arena that would blend seamlessly into the surrounding Fife countryside. The building required a completely unobstructed internal floor space to ensure absolute rider safety during training, demanding a heavy-duty clear-span portal frame truss system with no vertical supports.

Span Width60ft (18.3m)
Eaves Height16ft (4.9m)
Execution ClassUKCA Execution Class 2 (EXC2)
Heavy Galvanized Biomass Wood Chip Storage Barn
Kelso, Scottish Borders 2026 Contract: £55,000

Heavy Galvanized Biomass Wood Chip Storage Barn

Dryburgh Wood Estates required a specialized, heavy-duty storage barn to house highly combustible biomass wood chips. The storage environment required heavy machinery clearance (for high-reach telehandlers dumping timber loads) and complete protection from damp timber rot, demanding an open-sided, corrosion-resistant steel superstructure.

Span Width40ft (12.2m)
Eaves Height18ft (5.5m)
Execution ClassUKCA Execution Class 2 (EXC2)
Premium Machinery Store with Double Roller Bays
Gorebridge, Midlothian 2026 Contract: £68,000

Premium Machinery Store with Double Roller Bays

Borthwick Farm Holdings required a secure, dry workshop and machinery storage facility to house heavy GPS-guided cropping equipment, seeders, and high-value private farm trucks. The client demanded high-speed automated roller shutters on the bays and advanced condensation protection to prevent electronics damage.

Span Width50ft (15.2m)
Eaves Height14ft (4.3m)
Execution ClassUKCA Execution Class 2 (EXC2)